learning the ropes

things I made at ITP and after: sketches, prototypes, and other documentation

Tuesday, January 12, 2010

Day 1 at gallery@calit2 (UCSD)

Today was the first day of setup for “Overheard” at gallery@calit2 at the University of California – San Diego.

Our load-in went smoothly and by the end of the day, we had all of the technical elements in place: conversations loaded on 20 LCD panels, custom software driving a continuous images spanning across 3 projectors, 2 rope&pulley units installed, and custom software driving 6 channels of simultaneous audio.

Tomorrow we will begin by taking the time to observe the combination of the technical elements with the content in the gallery space and from there, decide how to shape those elements.

IMG_2778 IMG_2765

I’m feeling good.  Wendy is feeling good.  Many thanks to fine staff at the gallery for all of their assistance in getting us up and running.

posted by Michael at 2:13 am  

No Comments »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a comment

Powered by WordPress